A route designed for:
Assessment of the place:
assessment: 0
Add this place to your route: add

Sromowce Niżne footbridge - Czerwony Klasztor

The footbridge was opened in 2003, but efforts to build it had been made since 1914, so almost a hundred years and two world wars awaited its implementation.

Bridge was opened in 2003, but efforts to build its already been done since 1914 and, therefore, almost a hundred years and two world wars and a check Votes on its implementation.

It allowed the construction of the bridge patency loop hiking trail of Szczawnica by S Kolic, three crowns and after passing through the bridge along Dunajca Red Convent and another bridge to Sz part awnicy. The crossing is only available for pedestrians and cyclists. From the date of Poland's entry into the Schengen area, border controls have disappeared at the footbridge.

And the footbridge was designed as a metalw and suspended. This structural arrangement of the bridge span currents with a span of 90 m and two bays shore span of 2 x 10.5 meters. The total length of the bridge, with the ramps with ground is almost 150 m. Deck structure consists of two beams of laminated wood, steel one liter of concentrated - frames and wind bracing assembly. The bridge girders are made of spruce wood. The inner and outer and upper surfaces of the girders were lined with a larch wood board. The span of the footbridge is 90 m, which places the footbridge in Sromowce among the structures with the longest transmission in the world among suspended bridges with a wooden structure.

Godziny otwarcia:

round the clock

Adres:

Sromowce Niżne, 34-443 Sromowce Niżne